Ordering
MOQ, lead time and payment
Minimums depend on whether a model is stocked or made to order, and on the packaging. The table below is the planning range; the quotation states the exact number per model.
MOQ by order type
- Stocked models: 10-50 pcs per model.
- Custom colour or engraving: 200-500 pcs.
- New shape or private label: 500-1,000 pcs.
Lead time
- Stock order: 7-15 days.
- Production after sample approval: 30-45 days.
- Peak season (August-November): add 7-14 days.
Payment
- 30% deposit, balance before shipment is the standard arrangement.
- Terms can be discussed for repeat orders.
Measured MOQ and lead time by line
- For median, p25 and p75 MOQ and lead time by 0–3 line — computed from our 1,400+ published styles — see the <a href="/moq-lead-time-benchmarks/">MOQ and lead time benchmarks</a>. It is the fastest way to check whether a line fits your target MOQ band before requesting a quotation.
MOQ by packaging type
- Stocked model, neutral packaging: from 10–20 pcs per model.
- Stocked model, printed box or sticker label: usually 100–300 pcs per model.
- Custom colour or finish on a stocked shape: usually 200–500 pcs per model.
- New shape or new tooling: quoted per project; the tooling line is separate from the unit price.
- Mixed container: the minimum applies per model, not per container — 8–15 models can share one loading plan.
How to lower a first order
- Start from a stocked model and a standard colour, and keep the packaging neutral for the first run.
- Order one carton per model first, then consolidate the reorder into a mixed container.
- Ask which models already have a test report for your market — a tested configuration removes a testing step.
FAQ
Can I mix models to reach the MOQ?
Yes for stocked models - the MOQ is per model, and a mixed container is fine.
Is the MOQ per model or per order?
Per model. A mixed order can combine several models, each at its own minimum, into one shipment.
Can the MOQ be lower for a sample order?
The sample quantity is quoted separately from the production MOQ; it does not change the production minimum.